Keshvar Co. Keshvar Co.
Formulane

Formulane

Change once. Right everywhere.

Plan a production run in one conversation. Formulane calculates every ingredient, updates the batch sheets and sends them to the right people. Your team approves.

  • Every number comes from one tested calculation engine
  • Stock is checked and shortages are flagged
  • Nothing is released until people approve
Formulane Assistant · Choc Almond Protein Bar · Customer Y
Plan production for the Choc Almond Protein Bar for Customer Y.
Sure. How many batches do you want to make?
3 batches.
How many bars go into one batch?
10,000 bars of 60 g.
That's 600 kg per batch and 1,800 kg in total. You'll need:
IngredientPer batch3 batches
Whey protein isolate132.0 kg396.0 kg
Milk protein conc.60.0 kg180.0 kg
Soluble fibre syrup108.0 kg324.0 kg
Almond butter54.0 kg162.0 kg
Rolled oats48.0 kg144.0 kg
Soy protein crisps42.0 kg126.0 kg
Chocolate coating109.2 kg327.6 kg
4 minor ingredients46.8 kg140.4 kg
Do you want to add a safety margin, in case something goes wrong during production?
Yes, add 3%.
Updated with a 3% margin: 618 kg per batch, 1,854 kg in total.
IngredientPer batch3 batches
Whey protein isolate136.0 kg407.9 kg +11.9
Milk protein conc.61.8 kg185.4 kg +5.4
Soluble fibre syrup111.2 kg333.7 kg +9.7
Almond butter55.6 kg166.9 kg +4.9
Rolled oats49.4 kg148.3 kg +4.3
Soy protein crisps43.3 kg129.8 kg +3.8
Chocolate coating112.5 kg337.4 kg +9.8
4 minor ingredients48.2 kg144.6 kg +4.2
If that's everything, I'll update the batch sheets and send them to the project manager, production line 1, purchasing and QA. Shall I go ahead?
Yes, go ahead.
Done.
  • Batch sheets updated · 3 × 618 kg
  • Project manager · sent for approval
  • Production line 1 · schedule drafted
  • ! Purchasing · whey isolate short by 58 kg, purchase request drafted
  • QA · allergen changeover check (milk, soy, almond) before the run
Nothing is released until the approvals are in.
Perfect, thanks.
Ask Formulane…

Example conversation for illustration.

From chat to production floor

Right on the sheet.
Right on the line.

The approved batch sheet goes straight to the production line, with the exact amount of every ingredient for every batch.

Batch sheet · Choc Almond Protein Bar Batch 1 of 3 · 618 kg · 10,300 bars Approved

Illustration

One source of truth

The formula behind
every answer.

Protein bars, breads, sauces or drinks: every product runs on one approved formula that feeds the batch sheets, the labels and your ERP.

Thai Green Curry Sauce · Customer M · Version 4 · 350 g jarWaiting for QA approval
IngredientERP codeAllergens% w/wkg · 2,000 kg batch$ / kg
Coconut milkRM-2104038.00760.02.80
WaterUT-0000120.00400.00.00
▾ Green curry paste Sub-formulaSF-00412Crustacean12.00240.06.50
Lemongrass · 30%RM-330153.6072.0
Green chili · 25%RM-330223.0060.0
Garlic · 20%RM-330042.4048.0
Galangal · 15%RM-330311.8036.0
Shrimp paste · 10%RM-33050Crustacean1.2024.0
Onion, dicedRM-310088.00160.01.10
Bamboo shootsRM-311207.00140.02.40
Modified starchRM-502103.5070.01.90
Fish sauceRM-41002Fish3.0060.03.20
SugarRM-900102.5050.00.95
Lime juiceRM-310772.0040.02.60
Thai basilRM-330901.5030.09.00
SaltRM-800021.2024.00.60
Kaffir lime leafRM-330940.8016.014.00
Soy sauceRM-41010Soy Wheat0.5010.02.10
Total100.002,000.02.60
Sodium per 100 g390 mg Spec ≤ 450 · Pass
AllergensFish · Crustacean · Soy · Wheat
Cost per jar$0.91
ERP BOMSyncs on release

Example formula for illustration

Why it matters

It rarely starts with a big mistake. It starts with a small one that repeats.

A miscalculationThe wrong raw material orderedThe wrong ingredientA failed trial

Then your customer
loses trust.

And trust is the hardest thing to win back.

One formula.
Too many copies.

In most food plants, a formula lives in spreadsheets, email threads and printouts across R&D, QA, purchasing, production and sales.

Today

Changes don't travel.

QA updates an allergen. The label, spec sheet and ERP still show the old version.

Formulane: one live formula, updated everywhere.

Today

One error spreads.

A wrong percentage is copied into the spec sheet, nutrition table, cost and batch sheets.

Formulane: one tested engine, checked before sign-off.

Today

Requests go missing.

Customer changes sit in personal inboxes. When someone is away, nobody picks them up.

Formulane: every request tracked, with an owner and a date.

Today

Know-how walks out.

The process lives in people's heads, so new hires need months to perform.

Formulane: the process built in, and the history on record.

One live formula

Change it once.
It's right everywhere.

Spec sheets, nutrition and label data, cost sheets, batch sheets and the ERP bill of materials all come from the same approved version.

Formula · Version 5Approved today · sesame removed
Customer spec sheetUpdated
Nutrition and label dataUpdated
Cost sheet and quoteUpdated
Batch sheetUpdated
ERP bill of materialsUpdated
Total = 100.00%Pass
Batch scaled, 4% cooking lossDone
Sodium ≤ 450 mg per 100 gPass
Allergens vs. customer specPass
Customer vs. production formula±2%

Calculation engine

Numbers you
can sign.

Weight percentages, batch scaling, yield, nutrition, allergens and cost, calculated by one tested engine and checked against the customer's spec before anyone approves.

Requests and approvals

Nothing slips
through the cracks.

From the customer's request to the production floor, every step has an owner, a due date and a live status.

  1. 1

    Customer submits

    In the customer portal, as a form, Excel or PDF.

  2. 2

    AI prepares

    A draft formula with calculations, checks and impact.

  3. 3

    Teams approve

    R&D, QA, purchasing and production, in parallel.

  4. 4

    Customer signs

    The exact version, approved online.

  5. 5

    ERP release

    The approved BOM goes to your ERP. No retyping.

Built for how
food is really made.

For contract manufacturers

Your customers own the recipes. Formulane keeps each customer's formulas, specs and approvals separate and linked to your production formulas.

Connects to your ERP

Designed to work with SAP and other ERPs: it reads materials, prices and stock, and releases approved BOMs, confirmed by your team.

Private by design

Canadian hosting, private AI that never trains on your data, and each customer sees only its own records.

Founding customers

Be one of the first.

Formulane is new. We're working with a small group of food manufacturers to shape it around real plants and real formulas, with preferential pricing and a direct say in what we build next.

  1. Discovery, 2 weeks. We map how a formula change moves through your company.
  2. Prototype. You see Formulane working with one of your own formulas.
  3. Pilot, 10 to 12 weeks. Two or three of your customers, live, with a go / no-go at the end.
  4. Rollout. Only when the pilot proves its value.

See it with
your own formula.

Send us one anonymised formula and a recent change request. We'll show you how it runs in Formulane.